
What to Include in an MEP Scope Before You Request a Quote
Most MEP pricing differences come from what each bidder assumed. A clear scope lets you compare quotes like for like and avoids variations once work starts.
Define design responsibility
State whether you are issuing for-construction drawings or asking for design-build. If the contractor is responsible for design, say which loads, duties and standards the design must meet, including the relevant parts of the Saudi Building Code and any Civil Defense requirements.
Share what exists
Include architectural and structural drawings, load schedules, equipment lists and the point of connection for power, water and drainage. Note anything still in development.
Agree the boundaries
- Who provides builders' work such as openings, sleeves and plinths?
- Who applies for authority connections and approvals?
- Who supplies owner-furnished equipment, and who installs it?
Spell out the end of the job
Testing, commissioning, as-built drawings, operation and maintenance manuals, training and the defects period all carry cost. If they are not in the scope, they may not be in the price.
Planning work of this kind? Learn about Rawae Business MEP services or request a quote.

